Calculation of volumes and materials for the project

Employer
Ilona
Project parameters
Type of cooperationPeriodic employment
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Jul 13, 2020 until Jul 18, 2020
Project description
The services of a specialist in the implementation of construction calculations are required. Volumes and materials are to be calculated. Two houses need to be counted.
Stage 1 (KF-100%; Laying exterior and interior walls-100%, interior doors-100%)
Stage 2 – (finishing -100%, roofing 100%, metal container-100%).
Stage 3- (Facade 100%; Filling of openings (doors, windows, stained glass windows, loggia) 100%)
Stage 4-- the whole engineer.
A paper where we have already started counting.
You're still doing it.
Each section is a separate statement.
Stage 1 (KF-100%; Laying exterior and interior walls-100%, interior doors-100%)
Stage 2 – (finishing -100%, roofing 100%, metal container-100%).
Stage 3- (Facade 100%; Filling of openings (doors, windows, stained glass windows, loggia) 100%)
Stage 4-- the whole engineer.
A paper where we have already started counting.
You're still doing it.
Each section is a separate statement.