Designing a exit from the track

Employer
Ilya
Project parameters
Type of cooperationPeriodic employment
SectionEngineering. Drawings
Prepaymentwithout prepayment
Acceptance of requestsfrom Jun 10, 2020 until Jun 20, 2020
Project description
The services of a road design engineer are required. It is necessary to design a congress from the federal highway to a secondary road. It is necessary to develop project documentation in accordance with the TU issued by Rosavtodor