Adjustment of estimates

Employer
[no-member:pro]Irina[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Jun 4, 2020 until Jun 6, 2020
Project description
A surveyor is required. Adjustments to the estimates are required. There are two estimates in word made in the "System of Issue of Estimated Documentation A0 v". 2.4.25.1 Copyright InfoStroy Ltd."
They need to be adjusted to reduce the total indicators. Term 1 day, payment upon completion on the card
They need to be adjusted to reduce the total indicators. Term 1 day, payment upon completion on the card