Implementation of construction projects

Employer
[no-member:pro]Andrey[/no-member:pro]Andrey
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsclosed
Project description
The services of a construction project designer are required. It is necessary to carry out a construction project mining farm (date of the center) with a total power consumption of 750 kW, as well as a construction project of a wood drying chamber with a capacity of 50 m3. The heat energy removed from the data center is used for heating the wood drying chamber. Wood drying should be fully automated to the highest possible quality.