A project for electrification of a private 2-storey house is needed. Taking into account the fact that the heating of the fireplace (air) + electric warm floor, infrared heaters, electric plinth (the project for heating and ventilation was published separately). It is also necessary to provide for remote heating switching off (for winter, the mode of visits - hitches).
House of SIP panels, laying is possible only external, on the first floor of the socket directly at the floor, wires on the board, then in one place the wires rise and diverge on the floor slabs, sockets of the second floor also at the floor.
Lighting of the first floor - bred in the interfloor overlap, the second floor - external, in a box.
The outlets are outdoors.
The switches are wireless. It is also necessary to provide a unified control (or to provide connection) of these switches to the smart home system.
15 KW of power is allocated to the site, the electric meter is two-band on the pole. UZO, UZA is required.
Consumers - refrigerator, microwave, washing machine, TV, ceramic induction stove (all 1 piece).
Also in the future, a summer kitchen is planned, and electricity is provided for it.
There should be lights outside the house.
A plan of sockets, drawings for workers for breeding during the construction phase are needed.
A column with electricity a few meters from the house to the house - underground must be provided.
House of SIP panels, laying is possible only external, on the first floor of the socket directly at the floor, wires on the board, then in one place the wires rise and diverge on the floor slabs, sockets of the second floor also at the floor.
Lighting of the first floor - bred in the interfloor overlap, the second floor - external, in a box.
The outlets are outdoors.
The switches are wireless. It is also necessary to provide a unified control (or to provide connection) of these switches to the smart home system.
15 KW of power is allocated to the site, the electric meter is two-band on the pole. UZO, UZA is required.
Consumers - refrigerator, microwave, washing machine, TV, ceramic induction stove (all 1 piece).
Also in the future, a summer kitchen is planned, and electricity is provided for it.
There should be lights outside the house.
A plan of sockets, drawings for workers for breeding during the construction phase are needed.