Development of project documentation

Employer
[no-member:pro]Evgeny[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsfrom May 14, 2020 until May 15, 2020
Project description
We will develop a TK, which will be an annex to the Treaty.
What is required from the Project documentation and what is required from you (below I will briefly describe)
Visual examination of the territory, study of problematic issues
- Development of basic design solutions with the development of vertical planning and coordination with the Customer
- Development of working documentation in accordance with GOST R.21.1101-1013 "Basic requirements for project and working documentation" in the composition of:
(1) Settlement of working drawings of the GP mark (General plan)
2) NDT (External sewerage) drawings (in case of refurbishment and replacement of drainage trays)
(3) Material specifications, volume statements
(5) Explanatory memorandum on the rationale and description of the project decisions adopted
Approximate area is about 12 thousand.
What is required from the Project documentation and what is required from you (below I will briefly describe)
Visual examination of the territory, study of problematic issues
- Development of basic design solutions with the development of vertical planning and coordination with the Customer
- Development of working documentation in accordance with GOST R.21.1101-1013 "Basic requirements for project and working documentation" in the composition of:
(1) Settlement of working drawings of the GP mark (General plan)
2) NDT (External sewerage) drawings (in case of refurbishment and replacement of drainage trays)
(3) Material specifications, volume statements
(5) Explanatory memorandum on the rationale and description of the project decisions adopted
Approximate area is about 12 thousand.