Drawing work required

Employer
[no-member:pro]Grigory[/no-member:pro]
Project parameters
Type of cooperationOn a permanent basis
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsfrom May 9, 2020 until May 24, 2020
Project description
Drawing work is required. It is necessary to create for the production of drawings, specifications, details for machining