Freelance › Projects › Engineering. Drawings › Development of documentation for the organization of construction
Development of documentation for the organization of construction

Employer
[no-member:pro]Danila[/no-member:pro]
Project parameters
Type of cooperationOn a permanent basis
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsfrom Mar 21, 2020 until Mar 31, 2020
Project description
A specialist in the development of documentation for the organization of construction is needed.
Construction organization project (POS):
• Independent implementation of the PIC section for residential/non-residential areas
Buildings in accordance with 87 Resolution, TSN, JV, GOST, FZ.
• Identification of the need for special support
Constructions, devices, devices and installations, certain types of work,
Conditions of supply to the construction site of materials, structures, equipment and
P.
• Development and compilation of:
- construction calendar plan
- statements of the main volume of construction, installation and special construction works
- statements and schedule of requirements for construction structures, products,
Materials and equipment,
- statements and schedules of requirements for major construction machinery and
Construction vehicles
- statements and schedule of construction requirements for basic
Categories
• Development and design:
- Construction master plan (stroygenplan) of the preparatory period
and the main period of construction
- organizational and technological schemes
• Adjustments to projects in connection with adjustments to related departments, and
If necessary, make adjustments during the construction of the facility.
Construction organization project (POS):
• Independent implementation of the PIC section for residential/non-residential areas
Buildings in accordance with 87 Resolution, TSN, JV, GOST, FZ.
• Identification of the need for special support
Constructions, devices, devices and installations, certain types of work,
Conditions of supply to the construction site of materials, structures, equipment and
P.
• Development and compilation of:
- construction calendar plan
- statements of the main volume of construction, installation and special construction works
- statements and schedule of requirements for construction structures, products,
Materials and equipment,
- statements and schedules of requirements for major construction machinery and
Construction vehicles
- statements and schedule of construction requirements for basic
Categories
• Development and design:
- Construction master plan (stroygenplan) of the preparatory period
and the main period of construction
- organizational and technological schemes
• Adjustments to projects in connection with adjustments to related departments, and
If necessary, make adjustments during the construction of the facility.