Communications Design for Electric Power

Employer
[no-member:pro]Aleksandr[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentprepayment is possible
Payment methodsCash
Acceptance of requestsfrom Sep 27, 2019 until Oct 7, 2019
Project description
The services of a designer are required. Communication design for power generation facilities is required
Communications should be designed at four sites:
According to PS "A" - FOCL terminal equipment (optics are set on the territory of the object)
According to PS "B" - FOCL terminal equipment (optics are set on the territory of the object)
According to PS "C" - the FOCL highway along the power line in the grozotros (10 km) + terminal equipment on the PS
According to the software "D" - three RF communication channels (semi-completes on both sides)
The scope of work includes only remote design, no departures are implied. Communication with only one person - the curator in the section from our company.
We're providing the VPO.
We also provide the necessary data from the performers in other sections (they have almost prepared the OTR stage).
We pay according to a single scheme.
For each substation is divided into stages of OTR / P / P / RD stage and paid in 3 stages Advance / Readiness / Agreement.
Payment is made day-to-day in cash on the card.
This scheme allows the contractor to get rid of the coordination of other sections on the title, and from projects on different substations.
Communications should be designed at four sites:
According to PS "A" - FOCL terminal equipment (optics are set on the territory of the object)
According to PS "B" - FOCL terminal equipment (optics are set on the territory of the object)
According to PS "C" - the FOCL highway along the power line in the grozotros (10 km) + terminal equipment on the PS
According to the software "D" - three RF communication channels (semi-completes on both sides)
The scope of work includes only remote design, no departures are implied. Communication with only one person - the curator in the section from our company.
We're providing the VPO.
We also provide the necessary data from the performers in other sections (they have almost prepared the OTR stage).
We pay according to a single scheme.
For each substation is divided into stages of OTR / P / P / RD stage and paid in 3 stages Advance / Readiness / Agreement.
Payment is made day-to-day in cash on the card.
This scheme allows the contractor to get rid of the coordination of other sections on the title, and from projects on different substations.