Designing the operating zone in the RCC

Employer
[no-member:pro]Gennady[/no-member:pro]
Project parameters
Type of cooperationPeriodic employment
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Aug 10, 2019 until Aug 25, 2019
Project description
Device of the operating zone on the territory of the Distribution Center
It is necessary to develop sections of the RS, AR, CR, TH (provide in dwg format)
It is necessary to develop sections of the RS, AR, CR, TH (provide in dwg format)