Water pipeline project and WZU project

Employer
[no-member:pro]Danila[/no-member:pro]Danila
Project parameters
Type of cooperationOne-time project
SectionOther / Miscellaneous
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsclosed
Project description
Work project of water supply of the village for 18 houses in the Moscow region (separate technical and drinking water supply). The water pipeline project and the project of the HZU should contain all sections necessary for the installation and procurement of materials. 2 wells (40 and 80 meters) and 2 pipes for each site, a pipe from a well about 80 m deep is drinking with cleaning modules in the caisson, a pipe from a well about 40 m deep is technical and on watering. There should be 2 wells with hydrants along the street. There's a tank up to 10 cubic meters in the caisson. meters. Please contact us for a preliminary meeting and a schedule. SanPiN should be observed only partially. The project is for personal use.
Knowledge of the nomenclature of water valves. AutoCAD. Construction supervision is possible (specified separately). Conclusion of a domestic contract or a service contract.
Knowledge of the nomenclature of water valves. AutoCAD. Construction supervision is possible (specified separately). Conclusion of a domestic contract or a service contract.