A specialist in the design of smoke removal systems is required. It is necessary to develop a set of design and estimate documentation of the smoke removal system. The set of project documentation should be presented in 2 parts: - Technological part of the smoke removal system; - Electrical part of the smoke removal system. 5.3. Development of design solutions and calculation of the main indicators of the smoke removal system output of duplicate signals about the state of the control unit in the control room facility. 5.4. Development of an algorithm for interaction of smoke removal systems, automatic fire alarm systems and alerts with building engineering systems (general ventilation and air conditioning, access control and control systems).
Dibujos de trabajo y lista de materiales para un toldo de patio de acero
Necesitamos dibujos de trabajo, detalles de juntas y un presupuesto de materiales para un toldo de acero en el patio, además de un esquema de instalación.
Ingeniería. Dibujos23.09.20260197
0respuestas
Bueno saber
¿Cómo respondo a este proyecto?
Inicia sesión como freelancer, describe cómo resolverás la tarea, nombra tu precio y plazo. El cliente lee las respuestas y comienza un diálogo con las mejores.
¿Quién puede ver mi respuesta?
Solo el cliente que publicó el proyecto y tú. Otros freelancers no ven tu texto ni tu precio.