Revising the Model Workforce Report (Redmine)

Ксения
1

Ксения

no recommendations
no complaints
Closed
Project title: Revising the Model Workforce Report (Redmine)
Type of cooperation: One-time project
Section: Software development
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer, Electronic money
Acceptance of requests: closed

Project description:
1. Add to the settings of the standard report the flag “Introduce a plan”.
a. When the flag is removed, the report is formed in a typical manner.
b. When the flag is raised, the “Plan” field is displayed after the grouping field. The value for the field is derived from the field of the problem “Time Estimated” (Issue.estimated_hours).
c. When the flag is raised after the field "Plan" is displayed field "Otkl". Abs. The value is obtained by the formula:
- .
d. When the flag is raised after the field "Otkl". Abs is displayed in the field “Off”. s., %. The value is obtained by the formula:
*100/
Rounding shall be to the second decimal place.
e. When the flag is raised after the field "Otkl". Relative, %" is displayed by the field "Plan |Fact". The value is obtained by the formula:
= 0? :
f. Data output to columns from pp. b-e is produced for all groupings. If the record of labor costs is entered without specifying the task, the planned labor costs for them are taken equal to 0.

2. Increase the maximum number of simultaneously output groups from the typical 3 to 6.
3. Add the grouping “Tasks (with subtasks).” In the grouping, only tasks without subtasks are displayed (with an empty Parent field), the time spent and planned are derived by the task and all its subtasks, taking into account the hierarchy.
4. Add a filter to the closed problem field (Issue.closed_on)
5. The revision must be implemented in the form of a plugin.
6. Circumstances
redmine: 2.3.1-devel
ruby: 1.9.3 (x86_64-linux)
rails: 3.2.13
Project author
Ксения