Modeling and development of the management system

Азим
1

Азим

no recommendations
no complaints
Closed
Project title: Modeling and development of the management system
Type of cooperation: Periodic employment
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer, Electronic money
Acceptance of requests: closed

Project description:
Offering remote work. Modeling and development of an improved ammonia synthesis control system in AspenONE V10 is required.
Technical specification:
1. This model is designed in the AspenONE V10. (Aspen HYSYS, Aspen Plus or other Aspen file)
2. Develop improved ammonia synthesis control systems and modeling in the AspenONE V10. (Aspen HYSYS or other Aspen file)
3. Adequacy check. Get static and dynamic characteristics. ACC. SARS.
4. Calculation of material, thermal and energy balances. Achieving economic efficiency.
5. Detailed description of each step of the work performed. (Write to Word and record video from the screen scanner in simulation processes).
I need a specialist to create an improved TP management system. This is the most important condition of the project.
Project author
Азим