
1
Валентина
no recommendations
no complaints
Project title: Adjustment of project documentation
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Bank transfer
Acceptance of requests: from 2024-07-15 until 2024-07-20
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Bank transfer
Acceptance of requests: from 2024-07-15 until 2024-07-20
Project description:
Offering remote work. There's an air-supply RD. On the RD mounted: compressors, pipes CV (without omissions).
The customer added equipment that works on compressed air.
It is necessary:
- Adjust the RD to take into account new consumers (it is necessary to understand whether it is possible to add them without changing the diameter of the installed pipes);
- To correct the volume of TX project documentation for air supply.
What is needed for the TC project documentation.
The customer has changed the composition of equipment for production (number and type of injection molding machines), changed the location of equipment on the building plan, new equipment appeared in individual rooms.
It is necessary:
- Adjust the volume of the TH project documentation taking into account new equipment;
- Issue a task on related sections (VK, EOM) for making changes to them;
PS: There are plans in dwg with equipment arrangement and partially with connection points
Offering remote work. There's an air-supply RD. On the RD mounted: compressors, pipes CV (without omissions).
The customer added equipment that works on compressed air.
It is necessary:
- Adjust the RD to take into account new consumers (it is necessary to understand whether it is possible to add them without changing the diameter of the installed pipes);
- To correct the volume of TX project documentation for air supply.
What is needed for the TC project documentation.
The customer has changed the composition of equipment for production (number and type of injection molding machines), changed the location of equipment on the building plan, new equipment appeared in individual rooms.
It is necessary:
- Adjust the volume of the TH project documentation taking into account new equipment;
- Issue a task on related sections (VK, EOM) for making changes to them;
PS: There are plans in dwg with equipment arrangement and partially with connection points