
1
Екатерина
no recommendations
no complaints
Project title: Design of electrical equipment
Type of cooperation: Periodic employment
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer
Acceptance of requests: from 2024-04-03 until 2024-04-18
Type of cooperation: Periodic employment
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer
Acceptance of requests: from 2024-04-03 until 2024-04-18
Project description:
Remote work for the designer of electrical equipment. Required:
1. Development of design documentation (CD) according to the technical requirements for the equipment of the CTP, ZRU, OPU, CRU, GRSh, RUNN, systems of ICS TP, TM, OPS, OVIC, namely:
- Electrical circuit function
- Electrical structural circuit
- Principal electrical circuit
- Electrical circuit of connections (mounting)
- Electrical circuit of interlock connections
- Cable log.
- List of inscriptions(s)
- Marking of Cambrian and nameplate
2. Order support from the development stage to the assembly and acceptance stage of equipment at the site of the final customer's facility
3. CAD requirements:
Introduce the development in the EPLAN program
4. Requirements for performers.
The development of the CD can be carried out by both individuals and legal entities residing (location, in the case of legal entities) on the territory of the Russian Federation. Have telephone, email and various messengers (Viber, WatsApp) for operational communication.
Remote work for the designer of electrical equipment. Required:
1. Development of design documentation (CD) according to the technical requirements for the equipment of the CTP, ZRU, OPU, CRU, GRSh, RUNN, systems of ICS TP, TM, OPS, OVIC, namely:
- Electrical circuit function
- Electrical structural circuit
- Principal electrical circuit
- Electrical circuit of connections (mounting)
- Electrical circuit of interlock connections
- Cable log.
- List of inscriptions(s)
- Marking of Cambrian and nameplate
2. Order support from the development stage to the assembly and acceptance stage of equipment at the site of the final customer's facility
3. CAD requirements:
Introduce the development in the EPLAN program
4. Requirements for performers.
The development of the CD can be carried out by both individuals and legal entities residing (location, in the case of legal entities) on the territory of the Russian Federation. Have telephone, email and various messengers (Viber, WatsApp) for operational communication.