
1
Илья
no recommendations
no complaints
Project title: Make the calculation of the foundation on the clogged piles
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer
Acceptance of requests: from 2023-05-29 until 2023-06-03
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer
Acceptance of requests: from 2023-05-29 until 2023-06-03
Project description:
Offering extra earnings. It is necessary to calculate the pile-rotwerp foundation, pile clogs. There are geology reports, the project of the house itself.
You need to calculate the number of clogging piles, their length, choose a section.
Calculations must be provided in Word format.
Offering extra earnings. It is necessary to calculate the pile-rotwerp foundation, pile clogs. There are geology reports, the project of the house itself.
You need to calculate the number of clogging piles, their length, choose a section.
Calculations must be provided in Word format.