
1
Алексей
no recommendations
no complaints
Project title: Designing furniture for hotels
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer, Electronic money
Acceptance of requests: from 2022-02-24 until 2022-03-01
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer, Electronic money
Acceptance of requests: from 2022-02-24 until 2022-03-01
Project description:
The services of a furniture designer are required. It is necessary to design furniture capsules for hotels. Now in your hands:
1. Model in BAZIS Furniture Man
2. Photos of ready-made analogues abroad (attached one as an example)
3. Hand-held sketches
I will send all this to private messages ready to work with the project.
We need a trained practitioner designer.
What do you need?
1. I need a consultation. According to the model in BAZIS-Furnituremaker at the production received a response that it could fall apart. I mean. You need an experienced designer to look at the model and suggest optimization methods.
2. So, you have to *fix the model*.
3. As far as I know (again from the factory) there are not enough fasteners. We need to bring the model to a state ready for production.
4. Offer optimizations that could reduce the weight of the capsule.
The services of a furniture designer are required. It is necessary to design furniture capsules for hotels. Now in your hands:
1. Model in BAZIS Furniture Man
2. Photos of ready-made analogues abroad (attached one as an example)
3. Hand-held sketches
I will send all this to private messages ready to work with the project.
We need a trained practitioner designer.
What do you need?
1. I need a consultation. According to the model in BAZIS-Furnituremaker at the production received a response that it could fall apart. I mean. You need an experienced designer to look at the model and suggest optimization methods.
2. So, you have to *fix the model*.
3. As far as I know (again from the factory) there are not enough fasteners. We need to bring the model to a state ready for production.
4. Offer optimizations that could reduce the weight of the capsule.