
1
Алексей
no recommendations
no complaints
Project title: Configure the Simens S7-1500 controller
Type of cooperation: Periodic employment
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer, Electronic money
Acceptance of requests: from 2021-09-04 until 2021-09-19
Type of cooperation: Periodic employment
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer, Electronic money
Acceptance of requests: from 2021-09-04 until 2021-09-19
Project description:
There are tasks for the Simens S7-1500 tincture (with TIA Portal), working on the paint line, as well as a router for transferring logs to WEB
Locations: Moscow region.
Objective List:
1. Set up a router to transfer machine logs from Simens S7-1200 (with TIA Portal) to an external FTP.
2. Change the interval for the formation of logs in all log files created by the machine conroller
3. Change the intervals of forming log files for events and timing.
When responding, what is the experience of this task?
There are tasks for the Simens S7-1500 tincture (with TIA Portal), working on the paint line, as well as a router for transferring logs to WEB
Locations: Moscow region.
Objective List:
1. Set up a router to transfer machine logs from Simens S7-1200 (with TIA Portal) to an external FTP.
2. Change the interval for the formation of logs in all log files created by the machine conroller
3. Change the intervals of forming log files for events and timing.
When responding, what is the experience of this task?