Creating a BIM model of a residential house

Вячеслав
1

Вячеслав

no recommendations
no complaints
Project title: Creating a BIM model of a residential house
Type of cooperation: One-time project
Section: 3D graphics
Prepayment: prepayment is possible
Payment methods: Bank transfer
Acceptance of requests: from until 2021-03-18

Project description:
We need a specialist in 3D modeling and BIM modeling. It is required to create a BIM model of a 10-storey residential building

1. Task:

It is necessary to manufacture a BIM model based on the project documentation provided (Stages P and R) made in the AutoCad program.

2. Object:

10-storey residential brick house with external insulation, with a basement, on a ribbon foundation.

Engineering equipment of the facility was developed: Power supply system; water supply and sanitation systems; heating and ventilation systems; gas supply systems.
Outdoor networks have been designed: gas supply; water supply; sewage, electricity supply.
Technical and economic indicators
No p/p Name of the food. Measurements Indicators
1 Area of plot (within boundaries) m2 13 913.0
2 Floor levels of the building et. 10
3 Number of apartments. 180.
4 Total building area m2 16,447.29
5 Total area of apartments m2 9 385.92
6 Living area m2 5 217.48
7 Building area of a residential building m2 1,874.22
8 Building volume of building m3 53 324.79
9 Building volume (above)
Aut. 000) m3 48 250.7
10 Building volume (below)
Aut. 0.000 m3 5,074.09

3. Requirements for the BIM model:
• What is the model for: stage R, model for construction.
• Detail level of LOD 400, for use in the construction and installation phase.
• Coordination between systems is required. The model should have no intersections between sections, as well as in architectural and design models added holes for engineering networks.
• Size styles according to normal standards. No special requirements.
• Information saturation of the model. It is necessary that in addition to the 3D type, the systems are correctly named in the models.
• A classifier is needed for the elements of the model. It is necessary to obtain from the model volumes for the compilation of CMP.
• All sections of the project documentation are required according to the standard.

Please indicate the cost and timing of the production of the BIM model.
Project author
Вячеслав