Writing EIA

Employer
[no-member:pro]Алексей[/no-member:pro]Алексей
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Acceptance of requestsclosed
Project description
Offering remote earnings. It is required to write an EIA on the incinerator for the SEE.
Integrated samples
Integrated samples