1
Иван
no recommendations
no complaints
Project title: Work project on reconstruction of the heating system of the building
Type of cooperation:
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer, Electronic money
Acceptance of requests: from 2018-12-24 until 2019-01-03
Type of cooperation:
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer, Electronic money
Acceptance of requests: from 2018-12-24 until 2019-01-03
Project description:
Work project on reconstruction of the building heating system (complete replacement) is required. Linking the projected system with nature, calculating the coefficients of heat transfer and heat loss, calculation of heating devices, hydraulic calculation, placement of risers and devices on the plans, solution of the system scheme with drawing, all other works included in the scope of development of the working project. Provide for the restoration of the decoration of the premises after the installation work.
Main characteristics of the object: Building 3 floors (2 floors and basement), total area of 2000 m2. There's no ventilation. Thickness and material of walls: brick 600 mm.
From the initial data there is: passport, design assignment, inspection act (heat supply conditions), photos of the main existing nodes. A sketch showing the places of risers.
Desirable deadline: no more than 2 weeks.
Work project on reconstruction of the building heating system (complete replacement) is required. Linking the projected system with nature, calculating the coefficients of heat transfer and heat loss, calculation of heating devices, hydraulic calculation, placement of risers and devices on the plans, solution of the system scheme with drawing, all other works included in the scope of development of the working project. Provide for the restoration of the decoration of the premises after the installation work.
Main characteristics of the object: Building 3 floors (2 floors and basement), total area of 2000 m2. There's no ventilation. Thickness and material of walls: brick 600 mm.