1
Денис
no recommendations
no complaints
Closed
Project title: Photographing of land
Type of cooperation: One-time project
Section: Photography
Prepayment: without prepayment
Payment methods: Cash
Acceptance of requests: closed
Type of cooperation: One-time project
Section: Photography
Prepayment: without prepayment
Payment methods: Cash
Acceptance of requests: closed
Project description:
It is necessary to make a photofixation of several land plots in the Pushkin district of the Ministry of Defense.
Estimated time – 1-2 days for shooting, 2-3 days for preparing a report.
Example of photo report and map of land plots (strip-out plots do not need to be photographed) - in the appendix. The photo can be made less detailed than in the example.
Purpose of the photo report:
1) show the territory of the land as a whole - at least 1 photo per plot, or more if the plot is large or there are any heterogeneities that cannot be placed in 1 photo (for example, part of the plot is flat, part of the cliff, part of the quarries, part of the forest, part under the buildings, etc.)
2) show the boundaries and surroundings of the site preferably in relation to the site, but not necessarily (show access roads and / or exits to the site, borders - 3-4 photos of the borders with a view through the site, preferably 1 photo to the side of the world or more, if any types of environment require accentuation - shopping centers, individual buildings of the river reservoir, etc.)
(3) if there are buildings, structures, etc. on the site. 1 picture per building, if it does not cause a negative reaction of the inhabitants of the building (because the building is not a part of the building). We have not received a formal permit for inspection. When shooting a building or enterprise, it is desirable that large banners defining the nature of the activity in these buildings were taken into the frame.
4) to show the engineering infrastructure objects affecting the development of the site - power lines, TP, columns above gas pipelines, cables, etc., hatches and wells for various purposes,
(5) Other features that may seem interesting should also be noted and removed if possible, such as signs of self-invasion, planes flying over the site, traffic through the section of transport or use by unauthorized persons – beaches, for example,
When inspecting, it is advisable to write a gps track so that at any time you can determine the location of the shooting. The time in the GPS receiver and camera should be synchronized.
It is advisable to fill in the report in PowerPoint or Word, the template will be sent later.
It is necessary to make a photofixation of several land plots in the Pushkin district of the Ministry of Defense.
Estimated time – 1-2 days for shooting, 2-3 days for preparing a report.
Example of photo report and map of land plots (strip-out plots do not need to be photographed) - in the appendix. The photo can be made less detailed than in the example.
Purpose of the photo report:
1) show the territory of the land as a whole - at least 1 photo per plot, or more if the plot is large or there are any heterogeneities that cannot be placed in 1 photo (for example, part of the plot is flat, part of the cliff, part of the quarries, part of the forest, part under the buildings, etc.)
2) show the boundaries and surroundings of the site preferably in relation to the site, but not necessarily (show access roads and / or exits to the site, borders - 3-4 photos of the borders with a view through the site, preferably 1 photo to the side of the world or more, if any types of environment require accentuation - shopping centers, individual buildings of the river reservoir, etc.)
(3) if there are buildings, structures, etc. on the site. 1 picture per building, if it does not cause a negative reaction of the inhabitants of the building (because the building is not a part of the building). We have not received a formal permit for inspection. When shooting a building or enterprise, it is desirable that large banners defining the nature of the activity in these buildings were taken into the frame.
4) to show the engineering infrastructure objects affecting the development of the site - power lines, TP, columns above gas pipelines, cables, etc., hatches and wells for various purposes,
(5) Other features that may seem interesting should also be noted and removed if possible, such as signs of self-invasion, planes flying over the site, traffic through the section of transport or use by unauthorized persons – beaches, for example,
When inspecting, it is advisable to write a gps track so that at any time you can determine the location of the shooting. The time in the GPS receiver and camera should be synchronized.
It is advisable to fill in the report in PowerPoint or Word, the template will be sent later.