Profile of Freelancer Игоря

80

Игорь

no recommendations
no complaints
no portfolio
Group: Freelancer
Gender: Male

Country: Российская Федерация
City: Москва

Specialization: Construction, Production, Other Different
I represent: Private individual
Work experience: less than a year
Payment options: Cash, Bank transfer, Electronic money

About me:
Executive documentation in construction
Executive documentation in construction (etc. The concept of executive-technical or acceptance documentation is an important stage in the documentation of a construction object in the process of construction and installation works and is a confirmation of the work performed by regulatory and technical documents, as well as confirmation of the actually completed volumes of work.

The executive documentation includes: acts (certifications of hidden works, installation of critical structures, breakdown of axes, geodetic breaking base, repair of welded joint, welding of warranty joint, etc.), journals (general journal of works, earthworks, welding, installation of construction structures, geodetic works, pile clogging, concrete works, etc.), registers, lists, statements, executive geodetic schemes, etc.

Preparation of executive documentation
All executive and technical documentation is issued in accordance with the current NTDs in the Russian Federation (RD, GOST, SNIP, SDS, SNF, Instructions, ...) and is checked by project coordinators, also assigned to several facilities responsible for the timely delivery of acceptance documentation and proper registration of NTDs by Engineers at the facility. Forms of acceptance documentation fully comply with the requirements of standards, RD, Instructions and other documents.

Executive documentation is mandatory for registration by all construction and installation organizations performing works on capital repairs, reconstruction, technical re-equipment and reconstruction of capital construction facilities. After delivery, the PSD is the main document confirming the scope and quality of the work performed both for the Customer and for the Contractor.

Cost of Executive Documentation
How much is the executive documentation - this question is asked not a few construction companies in the state of which there is no department of the PTO. We will answer this question after submitting a full work project or a worksheet. The price can range from 2 thousand to several million rubles.

When calculating the cost of executive documentation, it is necessary to understand how many of the total types of work are performed on the object. Even when finishing works, you will need to issue more documents than the concrete foundations of an entire residential building. The number of jobs is important, not the volume.

When calculating, a statement of work volumes and project documentation is taken, an analysis of the types of CMP performed is carried out. The total cost of the object does not affect the cost of developing the executive documentation.

Executive Documentation by Type of Work
Formation and completion of the executive and technical documentation of the EIT and acceptance documentation in construction is carried out for all types of construction and installation works: general construction, welding and installation, finishing works, installation of engineering networks (outdoor heating networks, water supply, sewerage, heating, ventilation), technological and linear pipelines MN, MG, MNPP, electrical installation work, installation of instruments and means of installation of the ECP, installation of devices and means of electronic equipment, APC, APCS, and other equipment for work.

You can order a full list of technical documentation from us remotely. The whole process converges on providing the necessary data for its development in electronic form. The list of data provided includes: project documentation, details of the Contractor, the customer, Technadzor, Construction Control and other persons involved in construction.
Maintenance and delivery of executive geodetic documentation by unqualified personnel at the facility leads to an increase in the cost of construction, to untimely signing of the volume of work performed. By entrusting us with this work, you can forget about everything related to documentation in construction.

My skills:
execution

My personal qualities:
reliabilityspeed

Freelancer contacts:
Freelancer
Игорь