项目描述
The services of a specialist in the implementation of construction calculations are required. It is necessary to calculate the volume of work on the project with materials.
Objects: Two monolithic residential buildings. 5 and 6 sects 12-14 floors
For the project to calculate the volumes (+ materials)
All sections of the project.
Partially counted. A form of statement is available.
Term 2-3 weeks.
Objects: Two monolithic residential buildings. 5 and 6 sects 12-14 floors
For the project to calculate the volumes (+ materials)
All sections of the project.
Partially counted. A form of statement is available.
Term 2-3 weeks.
工程。图纸 银行转账