项目描述

1. General statement of materials, including waste and minimization.
2.1 Foundation plan (type of foundation with reference to the axes of the house)
Location of the beam (if present) or other beam-bound linkage to the axles of the house and with the marking of the height mark (e.g. lower plane of the beam 0.000)
3. Location of the 1st floor floor floor floor with bindings, step and increase of necessary elements + specification or cross-section designation
4. Shield plan (section of assembled shields in the horizontal plane) with drawing of the nodes of the connection of the shields + designation of the shields (for further comparison of the sweep of the shields with their location)
Example of shield designation B/1-3 or similar designation
Where B is the axis of the house in which the shield is located
1-3 - axes of the house between which there is a shield, and when the observer is spatially oriented, we assume that the axis 1 on the left and the axis 3 on the right
5. Drawings of shields with the required dimensions
+ heights at the bottom of the shield and at the top, taking into account the double tying
+ designation of the shield according to the plan of the shields
+ symbol of the second upper bandage
+ cross-section of the rigs and racks in the drawing (for understanding the device of such)
6. Plan of the second upper binding of the shields with overlap with respect to the first upper.
7. Subsequent sheets of upper floors overlap, shields, etc. Duplicate information content of the 1st floor.
Plan of the truss system with indication of the required dimensions, cuts
specification or indication of the required sections.
8.2 Roof plan with indication of dimensions, overhangs, areas of stingrays, corners.
Plan of the crate with the designation of the step and cross-section of the crate.
8.4 Drawing of the roof cake (if necessary).
8.5 In the case of a complex roof, it is mandatory to increase all the responsible units with the indication of the material cross-section.
9. On each sheet (sheets, shields, roofing) a summary statement of material is required.
工程。图纸 银行转账, 电子货币

SafeDeal 担保交易保护

资金锁定在 Payora USDT (TRC-20) 托管账户中,仅在确认验收作品后才会释放给自由职业者。

24
二十 · 提示

如何写出被选中的回复

  • 以客户的任务开头,而不是讲述自己的故事。
  • 链接一到两个来自您作品集的类似作品。
  • 给出一个价格和截止日期——以及它们具体包括什么。
  • 问一个澄清问题:这可以开始对话。

回复 0

回复文本仅对客户可见。

同类类别

类似项目

该类别中的所有项目
Turn-key office air-conditioning system design

Turn-key office air-conditioning system design

We need a complete HVAC cooling design for our office: heat-load calculation, layout, equipment selection and a bill of materials.

工程。图纸24.09.20260246
0回复
值得注意
我该如何回应这个项目?

以自由职业者身份登录,描述您将如何解决任务,命名您的价格和截止日期。客户会阅读回复并与最佳的进行对话。

谁能看到我的回复?

只有发布项目的客户和您自己。其他自由职业者无法看到您的文本或价格。

我在哪里可以找到类似的工作?

在“工程。图纸”中每天都有新项目出现。 该类别中的所有项目

此页面回答的问题