项目描述
It is required to perform the section ROM (GP) of the a / x object
All the inputs are available. Stage P
Required composition:
Explanatory memorandum
1. Situational plan;
2. The plan (although stage P)
3. The relief plan,
4. The plan of the earth masses;
5. The plan of improvement of the territory;
6. A network plan (there will be only one network)
7. Traffic.
All the inputs are available. Stage P
Required composition:
Explanatory memorandum
1. Situational plan;
2. The plan (although stage P)
3. The relief plan,
4. The plan of the earth masses;
5. The plan of improvement of the territory;
6. A network plan (there will be only one network)
7. Traffic.
其他 / 杂项 现金, 银行转账