项目描述
It is necessary to develop mounting schemes of prefabricated monolithic overlapping according to the initial data. We're providing an album of those. decisions. Implementation consultations. From you, the output of 3-4 sheets A4 : 1) Installation scheme, 2) Sections 1-2 sheets, 3) Specification.
The volume of 100 installation schemes. Work at the AutoCade.
The volume of 100 installation schemes. Work at the AutoCade.
其他 / 杂项 现金, 银行转账, 电子货币