Offering remote earnings. It is required to develop an operator panel PPO: Up to 5 user levels; Depth of slide attachments not more than 4, excluding authorization; Up to 31 mechanisms for managing and displaying status, control mode; Withdrawal of up to 63 discrete and analogue TIPs; Journalization of all events and actions of the operator; Up to 2 weeks before individual tests, the total period until December 20; with a guarantee of 3 years after acceptance into operation; Comply with the requirements of the TK; The development environment is free from panel manufacturers; Version control, use of GIT; Support for individual, complex, acceptance and delivery tests.
Looking for a QA tester to check the store layout across all browsers and devices.
सॉफ़्टवेयर विकास24.09.20260172
0प्रतिक्रिया
जानने के लिए अच्छा
मैं इस प्रोजेक्ट का जवाब कैसे दूं?
फ्रीलांसर के रूप में लॉग इन करें, बताएं कि आप कार्य को कैसे हल करेंगे, अपनी कीमत और समय सीमा बताएं। ग्राहक प्रतिक्रियाएँ पढ़ता है और सबसे अच्छे लोगों के साथ संवाद शुरू करता है।
कौन मेरी प्रतिक्रिया देख सकता है?
केवल वह ग्राहक जिसने परियोजना पोस्ट की है और आप। अन्य फ्रीलांसर आपकी टेक्स्ट या कीमत नहीं देख सकते।