关闭 预付款
Preparation of estimates in the TSN on the set of works with volumes and prices
The commercial proposal in the regulatory framework in the TSN should be recalculated. It's urgent. Timelines (shortest possible) are required.
文本和翻译07.11.20173875
3回复